Project Overview
The train load-out facility formed part of the siteβs material handling infrastructure. The project involved the safe dismantling and removal of the load-out bin, supporting steelwork and associated structures.
Detailed planning, lift studies and removal sequencing were undertaken to ensure the works were completed safely within a live industrial environment.
Key Features
- Engineered lift studies
- Structural sequencing
- Dual crane lifts
- Work pack preparation
- Risk management and controls
- Active industrial environment
Project Gallery
Before Removal
Staged Dismantling
Dual Crane Lift
Final Site Condition
Removal Methodology
Detailed site assessment and lift studies
Site inspections, 3D modelling and lift studies were completed to determine the safest removal methodology.
Sequenced dismantling
Top-down removal of the load-out bin and associated steelwork using staged dismantling techniques.
Controlled crane operations
Dual crane lifts were used to safely remove large structural sections within constrained areas.
Site clean-up and load out
All material was processed, sorted and removed from site in accordance with environmental requirements.